This page shows greenway and trail planning information for your community.

Illinois:


Greenway Planning Information for

Lake Zurich

Report Card

Miles of Greenways

0.1

Area (miles2)

6.9

Greenway Density (miles/miles2)

0.0

Grade:

FAIL



Population

18,104

Median HH Income

$84,125

External Links

Greater Chicago Housing and Community Development Website
Census Data
RTAMS: Regional Transportation Asset System 

(Requires a free user account)
RTAMS
Wikipedia entry for Lake Zurich
Lake Zurich

State Plans

Region Plans

County Plans

No plans are available on the Community level for Lake Zurich

No plans are available on the Open Space Area level for Lake Zurich

Bike/Ped Fatalities & Injuries
Crash data from 2005
Crash SeverityCount
Pedestrian "B" Injury (non-incapacitating injury)5
Pedestrian "A" Injury (incapacitating injury)1
Greenways in Lake Zurich:
  • = Rail-Trail
  • = Waterway
  • = Rail-with-Trail
  • = Utility ROW
Corridor Utilization
      in miles
Existing Build-
out
Existing
———
Build-out
Buffalo Creek corridor0.1(1st)1.7 8%
EJ&E corridor0.0(2nd)2.9 0%
Existing Grade Separations
    All trails in Lake Zurich cross roadways at-grade.
Needed Grade Separations
    No highway/trail crossings in Lake Zurich have been identified as needing grade separations.
Rank Among Neighbors
★ = has over 5 miles of Existing Trails
★ = has Planned Trail(s)
Greenway Density
      miles/miles2
ExistingBuild-out