This page shows greenway and trail planning information for your community.

underpassgallery:


Greenway Planning Information for

Berkeley

Report Card

Miles of Greenways

0.5

Area (miles2)

1.4

Greenway Density (miles/miles2)

0.3

Grade:

D+



Population

5,245

Median HH Income

$56,481

External Links

Greater Chicago Housing and Community Development Website
Census Data
RTAMS: Regional Transportation Asset System 

(Requires a free user account)
RTAMS
Wikipedia entry for Berkeley
Berkeley

State Plans

Region Plans

County Plans

No plans are available on the Community level for Berkeley

No plans are available on the Open Space Area level for Berkeley

Bike/Ped Fatalities & Injuries
Crash data from 2005
Crash SeverityCount
Pedestrian fatality2
Pedestrian "A" Injury (incapacitating injury)1
Bicyclist "B" Injury (non-incapacitating injury)1
Pedestrian "C" Injury (possible injury)1
Greenways in Berkeley:
  • = Rail-Trail
  • = Waterway
  • = Rail-with-Trail
  • = Utility ROW
Corridor Utilization
      in miles
Existing Build-
out
Existing
———
Build-out
IPP - Main Stem0.4(1st)0.4 100%
Existing Grade Separations
Needed Grade Separations
    No highway/trail crossings in Berkeley have been identified as needing grade separations.
Rank Among Neighbors
★ = has over 5 miles of Existing Trails
★ = has Planned Trail(s)
Greenway Density
      miles/miles2
ExistingBuild-out