This page shows greenway and trail planning information for the selected county.
|
|
Corridor Utilization in miles |
||||
Existing | Build- out |
Existing ——— Build-out |
|||
2.8 | (1st) | 8.8 | |||
1.1 | (2nd) | 8.0 | |||
★ = has over 60 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
Existing | Build-out | |||
Tazewell | ★ | 0.29 (1st) | 1.23 | |
McLean | ★ | 0.26 | 0.3 |
★ = has over 5 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
Existing | Build-out | |||
Pekin | ★ | 0.29 | 1.23 |