This page shows greenway and trail planning information for the selected county.
|
|
Corridor Utilization in miles |
||||
Existing | Build- out |
Existing ——— Build-out |
|||
14.0 | (1st) | 14.0 | |||
0.0 | (2nd) | 7.8 | |||
★ = has over 60 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
Existing | Build-out | |||
Whiteside | ★ | 4.43 | 4.43 | |
Bureau | ★ | 3.48 | 3.48 | |
Henry | ★ | 2.84 | 2.84 | |
Boone | ★ | 0.94 (4th) | 1.47 | |
Stephenson | ★ | 0.79 | 0.79 | |
Winnebago | ★ | 0.43 | 0.82 | |
Grundy | ★ | 0.14 | 2.5 | |
DeKalb | ★ | 0.13 | 2.76 |
★ = has over 5 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
Existing | Build-out | |||
Caledonia | ★ | 9.24 | 9.24 | |
Capron | ★ | 7.70 | 7.70 | |
Poplar Grove | ★ | 0.80 | 0.80 | |
Belvidere | ★ | 0.00 | 0.85 |