This page shows greenway and trail planning information for the selected county.
|
|
Corridor Utilization in miles |
||||
Existing | Build- out |
Existing ——— Build-out |
|||
27.9 | (1st) | 32.8 | |||
10.8 | (2nd) | 14.7 | |||
9.0 | (3rd) | 12.2 | |||
6.7 | 6.7 | ||||
4.8 | 5.3 | ||||
4.3 | 4.5 | ||||
3.3 | 3.3 | ||||
1.9 | 5.3 | ||||
1.8 | 4.7 | ||||
1.4 | 1.4 | ||||
1.4 | 4.9 | ||||
1.2 | 7.6 | ||||
1.2 | 1.2 | ||||
1.1 | 6.6 | ||||
0.7 | 7.9 | ||||
0.5 | 9.7 | ||||
0.5 | 13.4 | ||||
0.5 | 2.7 | ||||
0.3 | 6.5 | ||||
0.2 | 4.6 | ||||
0.0 | 5.5 | ||||
0.0 | 3.3 | ||||
0.0 | 5.0 | ||||
0.0 | 5.5 | ||||
0.0 | 2.9 | ||||
0.0 | 3.3 | ||||
0.0 | 1.0 | ||||
★ = has over 60 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
Existing | Build-out | |||
Whiteside | ★ | 4.43 | 4.43 | |
Bureau | ★ | 3.48 | 3.48 | |
Henry | ★ | 2.84 | 2.84 | |
Boone | ★ | 0.94 | 1.47 | |
Stephenson | ★ | 0.79 | 0.79 | |
Winnebago | ★ | 0.43 | 0.82 | |
Grundy | ★ | 0.14 | 2.5 | |
DeKalb | ★ | 0.13 | 2.76 |
★ = has over 5 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
Existing | Build-out | |||
Virgil | ★ | 1.46 | 1.46 | |
Lily Lake | ★ | 0.84 | 0.84 | |
South Elgin | ★ | 0.77 | 1.07 | |
Wayne | ★ | 0.63 | 1.56 | |
Batavia | ★ | 0.46 | 0.63 | |
Aurora | ★ | 0.43 | 0.85 | |
West Dundee | ★ | 0.39 | 1.28 | |
Sugar Grove | ★ | 0.35 | 1.21 | |
Geneva | ★★ | 0.35 | 0.99 | |
Carpentersville | ★ | 0.30 | 0.30 | |
St. Charles | ★★ | 0.28 | 0.80 | |
North Aurora | ★★ | 0.26 | 1.12 | |
Campton Hills | ★ | 0.20 | 0.23 | |
Elgin | ★★ | 0.14 | 0.81 |