This page shows greenway and trail planning information for the selected county.
|
|
Corridor Utilization in miles |
||||
Existing | Build- out |
Existing ——— Build-out |
|||
1.3 | (1st) | 4.1 | |||
★ = has over 60 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
Existing | Build-out | |||
Rock | ★ | 0.18 (1st) | 0.59 |
★ = has over 5 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
Existing | Build-out | |||
Beloit | ★★ | 0.18 | 0.59 |