This page shows greenway and trail planning information for the selected county.
|
|
Corridor Utilization in miles |
||||
Existing | Build- out |
Existing ——— Build-out |
|||
5.6 | (1st) | 5.9 | |||
2.7 | (2nd) | 3.6 | |||
1.0 | (3rd) | 1.2 | |||
★ = has over 60 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
Existing | Build-out |
★ = has over 5 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
Existing | Build-out | |||
Bloomington | ★★ | 0.39 | 0.44 | |
Normal | ★ | 0.04 | 0.05 |